No delays with screw pile solutions

During construction timber driven piles which have deviated from their surveyed position can be rectified by installing screw piles to select positions. 

Piles an be installed within boxing and without further excavation - preventing any further hold-ups to the construction programme.
 

Screw pile foundations used to rectify mispaced timber driven pile